Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System
The Brushy Creek Regional Utility Authority (BCRUA) – a collaboration between the cities of Cedar Park, Round Rock, and Leander, Texas – is advancing its Phase 2 Deep Water Intake Project to secure a long-term, drought-resilient water supply from Lake Travis. This critical infrastructure project involves the construction of a new deepwater intake system designed to access water at greater depths, ensuring continued service even during extreme low-lake conditions. Schnabel has served as the lead designer and engineer of record for this intricate project’s tunnels, shafts, and underground cavern.
The BCRUA project has called for two new lake tap intake towers, which connect to an 8,800-foot-long gravity intake tunnel excavated through rock. This tunnel has an excavated diameter of 11 feet, reaches depths between 100 and 400 feet below ground, and is lined with cast-in-place concrete. Water from the intake tunnel flows into a 30-foot-diameter, 300-foot-deep wet well and underground suction chamber. Six pump well shafts, which were constructed by the raise bore method, connect the suction chamber to the pump station at the surface. The pump station is designed for an ultimate capacity of 145 million gallons per day and will house up to 10 pumps (six in the raise bore shafts and four in the wet well).
The pump station sends water back underground through a seventh raise bore shaft to the transmission tunnel. This transmission tunnel is 2,600 feet long and 11 feet in excavated diameter. It is lined with a 78-inch mortar-lined steel pipe, and connects to the existing Phase 1 transmission main on the opposite side of the lake at Trails End Road. The Trails End Road Shaft was constructed with a combination of secant piles and blind bore methodologies.
The project also includes a maintenance facility, consisting of a building and a chemical feed pipeline that ties into the lake taps through a directional bore.
Schnabel’s scope of work included the full design of the project’s tunnels, shafts, and suction chamber, as well as geotechnical investigations and recommendations for the pump station and maintenance facility. Our team ultimately produced construction documents such as drawings, specifications, the Geotechnical Data Report (GDR), and the Geotechnical Baseline Report (GBR). We also conducted constructability assessments and cost estimate reviews, and facilitated interdisciplinary coordination.
In addition, Schnabel led the development and execution of the project risk management plan. This included performing qualitative risk analyses; maintaining and updating the project risk register to identify, characterize, and mitigate potential risks; and conducting a probabilistic quantitative analysis of cost impacts from risk events to support the establishment of construction contingency.
Now that the project is in the construction phase, Schnabel is providing on-site construction management and inspection services for the tunnels and shafts. Our responsibilities include staffing the project with full-time, on-site resident engineers and inspectors; monitoring surface settlement; coordinating with groundwater monitoring subconsultants; reviewing contractor submittals and RFIs; participating in formal risk management meetings; and overseeing the administration of all underground construction activities.